English
联系方式
网站地图
Site-Search
首页
公司
新闻中心
应用及解决方案
产品
PrimeServ
招聘中心
船用系统
电厂
透平机械
环境
全球网络
PrimeServ 技术中心
PrimeServ 参考资料
透平机械
压缩机
燃气轮机
蒸汽轮机
压缩机
燃气轮机
蒸汽轮机
07/01/2011, Customer Fleet Reaches 4 Million EOH
In January 2010 the THM gas turbine fleet of a South American customer reached the mark of four million equivalent operating hours. The gas turbines as well as the driven equipment are serviced by MAN PrimeServ within a long-term service agreement.
30/11/2006, Turbogenerator MARC2-C11
In March 2005 MAN Turbo received the order to supply a steam turbine (including recooling plant) for the biomass-fired CHP plant of Schößwendter-Holz in Saalfelden, Austria
10/12/2004, HOFIM™ Sealed in tandem configuration
A customer in Germany ordered a HOFIM™ Sealed (tandem version) compressor for a gas storage application in 2002
23/08/2004, Geared turbo-compressor for the compression of vapours
In 2003 MAN Turbo was awarded a contract from a Scandinavian customer for a geared turbo-compressor for the compression of vapours
06/06/2003, Isotherm Compressor with Steam Turbine Drive
In 1996, MAN Turbo was awarded the order to supply an isotherm compressor for an air separation plant in the Netherlands
Result pages:
1
2
3
4
5
6
7
8
9
10
联系人
联系人
For your messages or questions you can use our contact form.
Contact form
We will reply as soon as possible.